Diavik from the air

飞兔加速器ios

ssr 下载

Product

1,124

Employees

6-7M

Carats Production

60%

Ownership

2003

Started

2022 figures. 22% employees were Northern Indigenous.

Northwest Territories

ssr电脑版下载

Diavik comprises four diamond-bearing pipes that we mine using a combination of open pit and underground mining. The Diavik Diamond Mine is managed by Rio Tinto and is owned by a joint venture between Diavik Diamond Mines (2012) Inc., a wholly owned subsidiary of Rio Tinto (60% ownership) and Dominion Diamond Diavik Limited Partnership, a wholly owned subsidiary of Dominion Diamond Mines (40% ownership).

This is life, only in Canada

飞兔加速器ios

The design, construction and operation of Diavik is a story of success on a grand scale, in part because it is in one of the most challenging environments in the world: the sub-arctic tundra, one of the world’s pristine environments with one of the most delicate ecosystems. We are committed to protecting the biodiversity of this unique landscape.

恋与制作人李泽言ssr级瞬息怎么得?ssr级瞬息获取途径 ...:1 天前 · 恋与制作人系列软伀最新版本下载 恋与制作人电脑版 软伀版本:1.7.0516 手游电脑版 立即查看 恋与制作人 软伀版本:1.12.0521 iOS游戏 立即查看 恋与 ...

For example, we have developed world class engineering technology and techniques to hold back the waters of Lac de Gras (to reach the diamond-bearing pipes at the bottom of the lake) in a way that minimises disturbance. Once we have built the embankment, creating a pool of water within the lake, we pump millions of litres from this pool back into the lake, monitoring water quality and fish stocks.

怎样在电脑上下载手游阴阳师:2021-6-15 · 怎样在电脑上下载 手游阴阳师相关资料 阴阳师手游新手快速升级攻略 阴阳师手游新手快速升级攻略,在游戏中很多玩家发现别人都已经20多级了,自己才5、6级,那么要怎么升级快呢?下面就跟随游民小编一起来了解一下吧。阴阳师手游新手快速 ...

All mines have a finite life cycle and Diavik has planned for its closure from the outset. The buildings on site have been designed to be removed without a trace. And when mining ends, the embankments will be reclaimed and lake water will flow back into the open pit. 

飞兔加速器ios

We have developed world class engineering technology and techniques to hold back the waters of Lac de Gras (to reach the diamond-bearing pipes at the bottom of the lake) in a way that minimises disturbance. Once we have built the embankment, creating a pool of water within the lake, we pump millions of litres from this pool back into the lake, monitoring water quality and fish stocks. 

飞兔加速器ios

In 2018, we opened a fourth diamond pipe, known as A21, at the Diavik Diamond Mine. The new open pit pipe will provide an important source of incremental supply over the next four years to sustain production levels at the mine. The A21 pipe is located adjacent to Diavik’s existing mining operations at Lac de Gras. First ore was delivered in March following a four-year construction period and an investment of approximately $350 million, shared by Rio Tinto and joint venture partner Dominion Diamond Corporation. This investment to sustain production levels at Diavik reflects the strong outlook we see for the diamond industry. 

  • Wind turbine
    Offsetting Emissions
    Our focus on minimising our environmental impact was also inherent in our construction of an award-winning wind farm that generates enough renewable energy to power Diavik’s underground mine. It is one of the largest hybrid wind-diesel power facilities at a remote mine site and, since coming on line in 2012, the windfarm has offset Diavik’s diesel use by over 26 million litres and reduced the overall greenhouse gas emissions by 73,000 tonnes.
  • 电脑ssr软伀
    Planning for Closure
    All mines have a finite life cycle and Diavik has planned for its closure from the outset. The buildings on site have been designed to be removed without a trace. And when mining ends, the embankments will be reclaimed and lake water will flow back into the open pit.
    Read more
Diavik community

Diavik Communities

We are working to combat the spread and impact of COVID-19, to protect our people and communities while sustaining our operations and contribution to the economy

Read more
Gove employee

电脑ssr软伀

Discover more about life at Rio Tinto

Read more

Diavik Downloads

Read more about our policies and performance. 

View all downloads
  • Diavik Sustainability Report
    pdf, 2.02 MB
  • Diavik Community Legacy Projects
    pdf, 1.18 MB
  • Diavik: Constructing the Legacy
    pdf, ssr 下载

飞兔加速器ios

ssr电脑版下载

Diavik

PO Box 2498 Stn Main

电脑ssr软伀

5201 50th Ave

Yellowknife NT X1A 2P8, Canada

T: +1 867 669 6500
(outside office hours: ext 5903)